top of page
Corabia Solar Power

Located in the southern part of the country, 5,5 km from the Danube. Corabia Photovoltaic Park is the fifth MW solar park constructed by Renovatio.

 

Capacity: 7 MW.

Number of panels: 28602.

Panel Capacity: 245 wp.

Electrical Connection: T-Connection to a 20 kv line.

Location: Olt County, Romania.

Start of construction: Q4 2012.

bottom of page